— Water Management

Solar Power

Servo Motor

Insulation


Lighting

Temperature Management


Water Management

Waste Management

Current Project

Energy Saving And Payback Plan (Water Control)

ProjectsPurposeActual Water Usage before Installation (monthly)KWh
KG
LT
Planned Water usage after Installation (monthly)KWh
KG
M3
Planned Reduction %Investment (RMB)Estimated Payback (year)Date InstalledActual Water Usage after Installation (monthly)KWh
KG
M3
Actual vs Planned ReductionKWh
KG
M3
Achievement Rate of PlanReview Date
Installing a water collection poolWater saving100
(1)
m30m3150,00047Apr-2012No Submeter Record
Installing PIR tap and urinalWater saving160
(2)
m340m30.7510,4008May-2012No Submeter Record
**Remarks**
(1) Not submetered
(2) Not submetered

Water Submeter Figures - 2016

DateJanFebMarAprMayJunJulAugSepOctNovDecTotal
Total183782031832342783003062362122072192639
Office311435323232343328323234369
Dormitory000046809185621900383
North Workshop341640353438394337374245440
South Workshop371742383741444740434953488
Washing Workshop18821191919212017202326231
Kitchen632365596668717852616161728